NMA/COSCOL has several full-time Naval Architects working their transportations. For Floatover analysis and procedures, additional engineers are available, if needed.
Current Forward Contracts
- Talisman's Bunga Orkid A:
Offshore Malaysia - October 2008
- Hyundai Heavy Industries CSP-1 Topside:
Offshore U.A.E - March 2008
- Hyundai Heavy Industries UAP Topside:
Offshore U.A.E - May 2008
- Maersk Oil Qatar's BG Utility:
Offshore Qatar - May 2009 - Maersk Oil Qatar's BE Process Topside:
Offshore Qatar - Jube 2009
Hyundai Heavy Industries 6,600mt PUQC "Rong Doi" topside was successfully installed via float-over in offshore Vietnam by our m/v Kang Sheng Kou.
Hyundai Heavy Industries
#1 Jeonha-Dong, Dong Ku, Ulsan, Korea




Talisman's 9500mt BRE Gas Production Platform, built in Malaysia, was successfully floated over and installed in PM3 Commercial Arrangement Area (Water Depth - 54m) by the m/v Kang Sheng Kou on February 15, 2006. The Kang Sheng Kou's DP capabilities were vital to a quick and smooth installation. Engineering Company - Noble Denton UK
Sime SembCorp Engineering Sdn. Bhd.
PLO 336, Jalan Suasa, P.O. Box 55
81707 Pasir Gudang
Johor, Malaysia




The 9500mt Bunga Raya A topside, built at HHI's Vinashin Shipyard in Vietnam, was successfully installed in DP mode offshore Malaysia (Water Depth - 55) by the m/v Tai An Kou on July 27, 2003. This was the first offshore mating operation carried out using fully redundant Class 2 dynamic positioning. Engineering Company - Noble Denton UK